Riverside Exteriors
Portfolio Header

Project Portfolio

A proven track record of executing complex exterior envelopes for large-scale developments, prevailing wage public works, and tribal facilities across the Pacific Northwest.

The Bob Apartments

In Progress
Richland, WA
GC: SRM Construction, Inc.
Multifamily Apartment Building Complex (HUD-funded, Davis-Bacon prevailing wage)

Completed Scope

Fiber cement, wood, and metal siding installation, complete with all related trim, sealants, and flashings to deliver a finished exterior envelope.

Nespelem Longhouse / Community Center

Completed 2026
Nespelem, WA (Colville Tribes)
GC: Jimmy's Roofing
Nespelem Community Center for the Nespelem Tribe

Completed Scope

Installed Phenolic wall panel installation with z-girts, rigid insulation, and flashing system (labor-only scope).

Southridge Apartments

Completed 2025
Kennewick, WA
GC: Eichler Construction Group
Multi-building apartment community plus separate clubhouse, amenity building, and pavilion

Completed Scope

Turnkey siding and vertical envelope, including Hardie/cemplank lap, panel, and soffit; drainable weather barrier; vinyl window installation; Trex deck install with hidden fasteners; and full sheet-metal fabrication and flashings package.

Casa de la Mora Apartments

Completed 2025
Yakima, WA
GC: M.C. Lundgren, Inc.
73 living units, 4 stories, 2 elevators (single building)

Completed Scope

Completed weather-barrier (DuPont Tyvek), vinyl window install, fiber-cement Hardie siding, pre-finished Taylor Metal 22-gauge steel siding, and full trim and flashing package — Davis-Bacon residential prevailing wage.

Buttercreek Apartments

Completed 2025
Hermiston, OR
GC: Wellens General Contractors, Inc.
Affordable apartment community (Sagebrush Affordable Housing, LLC)

Completed Scope

Completed Division 7 siding removal and installation with Division 8 vinyl window and sliding-glass-door installation per plans and specifications.

Mattawa Slope WGL Phase 3

Completed 2025
Mattawa, WA
GC: Walker Construction, Inc.
Multi-building Phase III apartment community (230 Patchee Drive)

Completed Scope

Installed Hardie siding, paneling, soffit, trim, WRB, window tape, seam tape, sealants, flex flashing, Brand X aluminum trim, and cedar accents.

Scattered Sites Phase 3

Completed 2025
Tri-Cities, WA
GC: Siefken & Sons Construction, Inc.
Phase 3 of the Scattered Sites exterior-renovation program (multiple sites)

Completed Scope

Continuation of multi-site exterior renovation — siding, trim, and weather-barrier replacement.

Eastern Oregon University

Completed 2025
La Grande, OR
GC: CB Const, Inc.
Eastern Oregon University campus building (One University Drive)

Completed Scope

Demolition, complete siding, vinyl window installation, and finish carpentry under Oregon BOLI prevailing wage.

Plastic Surgery Northwest

Completed 2025
Spokane, WA
GC: Walker Construction, Inc.
Medical office building (530 South Cowley Street)

Completed Scope

Installed Quick Panel fascia panels, weather barrier, and complete flashings package at all metal-cladding locations.

University Crossing

Completed 2024
Pullman, WA
GC: Graham Construction & Management, Inc.
4 buildings — 1 mixed-use building plus 3 residential buildings

Completed Scope

Completed Division 7 exterior building envelope — cementitious siding system, weather barrier, sheet metal flashings, sealants, and trim work for the entire community.

Highland Village Phase 2

Completed 2024
Airway Heights, WA
GC: Walker Construction, Inc.
7 buildings — residential Buildings C through H plus a community building

Completed Scope

Installed Cementitious siding system with R5 rigid insulation, vinyl window installation with flashing and sill pans, and full caulking package across all 7 buildings (Davis-Bacon residential prevailing wage; Section 3 and Evergreen Sustainable Development Standard).

WSU Vineyard Phase 2 Apartments

Completed 2024
Richland, WA
GC: Chervenell Construction Company
Multi-building Phase 2 apartment expansion serving WSU Tri-Cities students

Completed Scope

Pre-primed cement panel siding, aluminum trim, Tyvek weather barrier, soffits at breezeways, under decks, and accent bands, plus Miratec trim and stairwell siding.

Rhine Village Apartments

Completed 2024
Richland, WA
GC: Wellens General Contractors, Inc.
Multi-building apartment community (Rhine Village LLLP)

Completed Scope

Completed lump-sum siding installation per project plans and specifications.

Sun Garden Apartments

Completed 2024
Pasco, WA
GC: Booth and Sons Construction
Multi-building apartment community at 2320 W Sylvester Street

Completed Scope

Removed of existing vinyl siding, soffit, and metal fascia; new fiber-cement siding with LP shake, LP trim, house wrap, caulking, flashings, and new metal fascia.

Wild Rose Apartments

Completed 2024
Okanogan County, WA
GC: Cascade Central Construction
Affordable housing community for the Housing Authority of Okanogan County

Completed Scope

Completed lump-sum siding installation under Washington prevailing wage (Statement of Intent #1576444).

South Hill II Phase I

Completed 2024
Sunnyside, WA
GC: Walker Construction, Inc.
Multi-building Phase I apartment project

Completed Scope

Installed Cemplank fiber-cement siding with Hardie trim, commercial-grade Tyvek system, full caulking package, and 26-gauge aluminum gutters and downspouts.

Sycamore Glen at Quail Hollow

Completed 2024
Chewelah, WA
GC: Walker Construction, Inc.
Multi-building apartment community at 506 North Ehorn Lane

Completed Scope

Installed Hardie lap and board-and-batten siding with all corresponding trims, soffit, and fascia; complete WRB system. Includes vinyl-siding removal on existing building.

Sunnyside Manor II

Completed 2024
Sunnyside, WA
GC: Walker Construction, Inc.
Multi-building Phase II apartment community at 906 South 4th Street

Completed Scope

Fiber-cement siding, LP trim, Hardie soffit, commercial-grade Tyvek system, R-5 extruded polystyrene insulation, full caulking and flashing package, plus installation of supplied windows and doors.

Davis Apartments

Completed 2024
Portland, OR
GC: CB Const, Inc.
Multi-building apartment community at 1820 NE Davis Street

Completed Scope

Installed Hardie 4" and 7" lap siding, Cemplank, Hardie board-and-batten siding, Hardie trim, GreenGuard Raindrop 3D drainage wrap, single-piece parapet caps, soffits at stair landings, breezeway lids, and under-deck areas, with full flashing and caulking package.

Pendleton Cottages 2475 & 2543 Siding Replacement

Completed 2024
Pendleton, OR
GC: State of Oregon (Oregon Health Authority, Oregon State Hospital)
2 cottages (Cottages 2475 & 2543) at the Eastern Oregon Training Center (EOTC)

Completed Scope

Completed siding replacement at both cottages — direct State of Oregon public-improvement contract under BOLI Region 12 prevailing wage.

Yellowhawk Tribal Health Center

Completed 2024
Pendleton, OR (Confederated Tribes of the Umatilla Indian Reservation)
GC: BNBuilders, Inc.
New tribal health center facility

Completed Scope

Completed exterior cladding/siding scope under Davis-Bacon prevailing wage with certified payroll.

Fire Station 85

Completed 2024
Pasco, WA
GC: G2 Construction
New municipal fire station (3624 Road 100)

Completed Scope

Completed exterior siding and envelope per project specifications.

Boardman Regional Crisis Center

Completed 2024
Boardman, OR
GC: Kirby Nagelhout Construction Company
12,855 sf single-story behavioral health crisis center with 14 sleeping units, common areas, therapy spaces, kitchen, and offices — built for high-impact, vandal-resistant residential use

Completed Scope

Installed exterior siding and cladding system per project specifications, including specialty high-impact detailing on the residential side.

CTUIR Tamastslikt Museum Phase 2

Completed 2024
Pendleton, OR (Confederated Tribes of the Umatilla Indian Reservation)
GC: Chervenell Construction Company
Tamastslikt Cultural Institute museum building at 47106 Wildhorse Boulevard

Completed Scope

Demolished and replace existing siding and 26 windows. Includes window installation with exterior backer-rod and sealant, interior trim and furring, sill pans, flashing, and pre-construction coordination with window supplier for warranty compliance.

College Place Apartments

Completed 2023
College Place, WA
GC: Gerding Builders LLC
Multi-building affordable apartment community with separate clubhouse, monument signage, and trash enclosures

Completed Scope

Completed Division 7 exterior building envelope (excluding roofing) — siding, sheet metal wall caps, finish carpentry, trim, soffits, weather barrier, butyl flashings, and clubhouse mailroom finishes.

Fruitvale Housing

Completed 2023
Yakima, WA
GC: M.C. Lundgren, Inc.
54 living units, 4 stories, 1 elevator + rooftop machine room (single building)

Completed Scope

Tyvek Drainage Wrap, vinyl windows, full Hardie pre-primed cement-fiber siding system with manufactured wood trim and complete flashing/sealant package.

CTUIR Timine North Multi-Family Housing

Completed 2023
Mission, OR (Confederated Tribes of the Umatilla Indian Reservation)
GC: Chervenell Construction Company
Multi-family tribal housing development on the Umatilla Indian Reservation

Completed Scope

Installed exterior siding and trim across all buildings — TERO-compliant project with certified payroll.

Moorehouse Apartments

Completed 2023
Richland, WA
GC: Wellens General Contractors, Inc.
Multi-building apartment community (Moorehouse Apartments LLC)

Completed Scope

Completed lump-sum siding installation per project plans and specifications.

Mirabeau Apartments — Phase 1

Completed 2023
Spokane Valley, WA
GC: Baker Construction & Development, Inc.
3 apartment buildings (A, B, L) plus 1 garage building

Completed Scope

Installed Hardie Plank lap siding (cedar-mill 7" reveal), Hardie Panel at board-and-batten and channel sections, Hardie Soffit, full trim and aluminum extrusion details, and complete flashing package across all 4 buildings.

CV The Clark

Completed 2023
Pasco, WA
GC: Chervenell Construction Company
CV The Clark, LLC — apartment community at 1800 W Lewis Street

Completed Scope

Completed exterior siding scope per project plans and specifications under Master Subcontract Agreement.

Scattered Sites Exterior Renovations

Completed 2023
Tri-Cities, WA
GC: Siefken & Sons Construction, Inc.
Multiple housing-authority sites — exterior renovation portfolio

Completed Scope

Completed exterior renovation scope across multiple sites — siding, trim, and weather-barrier replacement.

Whitstran Elementary Additions & Modernization

Completed 2023
Prosser, WA
GC: Chervenell Construction Company
Whitstran Elementary School additions and full-building modernization (102101 W. Foisy Road)

Completed Scope

Installed Cement panel siding system installation per project specifications under prevailing wage with Intent/Affidavit/Certified-Payroll filings.

Sunnyside Housing Authority MFP

Completed 2022
Sunnyside, WA
GC: Walker Construction, Inc.
Multi-Family Preservation rehabilitation across multiple housing authority sites

Completed Scope

Demolished of existing siding, trim, fascia, and soffit; new install of James Hardie Prevail lap siding, soffit, trim, weather barrier system, vinyl windows, and exterior doors across the entire portfolio.

The Park at Medical Lake

Completed 2022
Medical Lake, WA
GC: Brumback Construction, Inc.
3-story garden-style wood-frame multi-family community (Medical Lake Apartments LLC) at 821 N Stanley Street

Completed Scope

Completed exterior siding installation per project plans and specifications.

Foothills Apartment Renovations

Completed 2022
Mabton, WA
GC: Walker Construction, Inc.
5 buildings at multiple addresses (Foothills Apartments)

Completed Scope

Demolished of existing vinyl siding; install of new rigid insulation, fiber-cement siding, soffit and trim, weather barrier system, vinyl windows and doors, and full gutter and downspout package across all 5 buildings.

Meadowlark Senior

Completed 2022
Omak, WA
GC: TW Clark Construction
New senior housing community at 624 North Pine Street

Completed Scope

Installed weather barrier with all tapes, flashings, fasteners and flex wraps; complete fiber-cement siding and trim system; vented and non-vented soffit; column and beam wraps; metal flashings and metal fascia wrap; full caulking package. Includes Alternate 2 (balconies).

Camp Umatilla Enlisted Barracks 1–4

Completed 2022
Hermiston, OR
GC: Fowler Construction
4 enlisted barracks buildings (EB-1, EB-2, EB-3, EB-4) at the Camp Umatilla Training Center

Completed Scope

Installed exterior fiber-cement siding system with Rockwool/rigid thermal insulation, weather barrier, stainless-steel flashings, joint sealants, finish carpentry, and vinyl window installation across all four barracks.

Alder Terrace

Completed 2021
Ellensburg, WA
GC: Walker Construction, Inc.
Affordable housing community (Alder Terrace Affordable Housing LLLP)

Completed Scope

Re-cladding of the existing siding assembly with James Hardie Prevail panel-and-lap fiber-cement siding, ventilated soffit panel system, new insulation, and complete trim, flashing, weather-barrier, and sealant package.

Sunset Ridge

Completed 2021
East Wenatchee, WA
GC: Walker Construction, Inc.
Multi-building apartment community — 32 exterior doors and 164 vinyl windows installed

Completed Scope

Demolished and full re-clad with new Prevail siding, Homeguard weather-barrier system, Hardie trim and soffit, post-and-beam wraps, new metal fascia, and installation of 32 exterior doors and 164 vinyl windows.

Garten House Apartments

Completed 2021
Leavenworth, WA
GC: Walker Construction, Inc.
Multi-building boutique apartment community in downtown Leavenworth

Completed Scope

Demolished of existing trim and shutters; install of rain screen, weather barrier, vinyl windows and sliders, full trim package (belly band, battens, corner trim), 1x4 tight-knot cedar accents, and rigid insulation throughout.

Mariposa Park Apartment Repairs & Rehabilitation

Completed 2021
Yakima, WA
GC: Walker Construction, Inc.
Multi-building apartment rehabilitation on Cherry Avenue

Completed Scope

Removed of existing metal siding and trim; new fiber-cement siding, trim, soffit, and fascia with weather-barrier system, AC unit reframing and insulation, and gable-extension framing across all buildings on Cherry Street.

Riverside Professional Center

Completed 2021
Richland, WA
GC: Hummel Construction & Development, LLC
Riverside Professional Center renovation

Completed Scope

Completed vertical aluminum siding, horizontal steel siding (Tyvek underlayment), metal trims, aluminum dormer soffits, matching fascia, deck demo, deck-frame repairs, James Hardie deck face, and cable-rail handrail system.

Condon Grade School

Completed 2021
Condon, OR
GC: Kirby Nagelhout Construction Company
New grade school for Condon School District (715 S Washington Street)

Completed Scope

Completed exterior siding and finishes per project specifications and prevailing wage requirements.

Cle Elum Ambulance Garage

Completed 2021
Cle Elum, WA
GC: TW Clark Construction
New ambulance garage at 201 Alpha Way

Completed Scope

Installed Greenguard Raindrop 3D weather barrier with all tapes, flashings, fasteners and flex wraps; complete fiber-cement siding and trim system; LP shake (in lieu of Hardie shake); vented and non-vented soffit; metal flashings.

Heatherstone Apartments Rehabilitation

Completed 2020
Kennewick, WA
GC: Walker Construction, Inc.
Multi-building apartment community including manager's unit, pool house, and garages

Completed Scope

Completed full exterior re-cladding — demo of existing siding, soffit, and fascia, then complete reinstall with HardiePlank lap, fiber-cement panel, and Hardie Shake siding, board-and-batten accents, all trims, soffit, weather barrier, and new metal fascia.

Columbia Park Apartments

Completed 2020
Richland, WA
GC: Wilshire Pacific Builders, LLC
32 buildings

Completed Scope

Siding, vinyl windows, and rain gutters across all 32 buildings (Davis-Bacon prevailing wage).

Greenpointe Townhomes

Completed 2020
Ellensburg, WA
GC: Highland Construction Consulting Services, Inc.
Multi-unit townhome development

Completed Scope

Completed lump-sum siding and weather-barrier system installation across the entire development.

Chuck Austin Place

Completed 2020
Yakima, WA
GC: Walker Construction, Inc.
5 residential buildings — A, B, C, D, and E

Completed Scope

Weather-resistive barriers, flexible-membrane flashings, cementitious trim and soffits, sealants, and vinyl window installation across all five buildings (Davis-Bacon residential prevailing wage).

Arrow Point Community Association

Completed 2019
Harrison, ID (Lake Coeur d'Alene)
GC: A & A Development Group, Inc.
3 buildings — Buildings C, D, and F

Completed Scope

Installed Hardie Shake siding installation per James Hardie HS1067 best practices — preserving the 30-year product warranty — including the curved-reveal verandas requiring an approved first-article installed.

Cosecha Court II Phase 2

Completed 2019
Granger, WA
GC: Walker Construction, Inc.
Phase 2 multi-building expansion of Cosecha Court II

Completed Scope

Fiber-cement siding and soffit, fiber-cement window and door trim, metal outside and inside corners, flashing at soffit and concrete, deck board wraps, vinyl window installation, commercial-grade Tyvek WRB, and metal fascia at gables.

Ronald McDonald Madison Street House

Completed 2019
Spokane, WA
GC: Bouten Construction Company
Ronald McDonald House Charities of the Inland Northwest — Madison Street House (1028 W. Fifth Avenue)

Completed Scope

Installed weather barrier system (complete) plus fiber-cement panel system with all vertical and horizontal trims (Tamlyn or approved alternate), termination/transition trims, rain-screen furring strips, and Pella wood-clad window detailing.

Wilbur and Cook Affordable Housing Portfolio

Completed 2018
Spokane, WA
GC: Walker Construction, Inc.
3 separate apartment properties — Valley 206, Wilbur, and Hill

Completed Scope

Tear-off of existing vinyl siding at garages; replacement of fascia with Hardie products; new siding install across all three sites with full flashings and trim package.

Sunset Americana Apartments

Completed 2018
Pasco, WA
GC: Cliff Thorn Construction
Multi-building apartment community on W Shoshone Avenue

Completed Scope

Demolished of existing siding and lava rock; new house wrap; Hardie HZ5 5" and 8" reveal smooth siding, Hardie Panel for board-and-batten, vinyl windows and sliders, and soffit installation at all covered lids.

WSU Tri-Cities Student Housing

Completed 2018
Richland, WA
GC: Chervenell Construction Company
On-campus student housing for WSU Tri-Cities (215 University Drive)

Completed Scope

Installed Cement panel siding system per project specifications.

Mattawa Slope WGL Phase II

Completed 2018
Mattawa, WA
GC: Walker Construction, Inc.
Multi-building Phase II apartment community (230 Pat Chee Drive SW)

Completed Scope

Completed exterior siding scope with full trim and weather-barrier package.

Cosecha Court II

Completed 2018
Granger, WA
GC: Walker Construction, Inc.
Multi-building affordable housing community (250 Cherry Hill Road)

Completed Scope

Completed exterior siding system including all trims, soffit, and fascia per project plans and specifications.

English Village & Coeur d'Alene Manor

Completed 2018
Coeur d'Alene, ID
GC: Walker Construction, Inc.
2 properties — English Village (115 East Anton Avenue) and Coeur d'Alene Manor (3016 N Government Way)

Completed Scope

Completed exterior siding scope across both properties.

Scott Street Apartments

Completed 2018
Spokane, WA
GC: Baker Construction & Development, Inc.
Multi-family apartment building at 743 South Scott Street

Completed Scope

Installed Hardie 7" cedar-milled lap siding (factory primed) at patios, sidewalls and breezeways; Hardie panel siding; Tyvek residential home wrap; window tape at heads and jambs; full vertical, horizontal, J, and corner trim package; tongue & groove soffit; mount blocks at lights.

Memory Care Addition — Riverview Retirement Community

Completed 2018
Spokane, WA
GC: Bouten Construction Company
New memory care addition at Riverview Retirement Community (1801 E. Upriver Drive)

Completed Scope

Completed fiber-cement (cement-board) siding scope — smooth fiber-cement materials with mock-up, courtyard fence siding, aluminum trim system, jamb and sill flashing, joint sealants, and dedicated pollution-insurance policy.

Valdemar Winery

Completed 2018
Walla Walla, WA
GC: Chervenell Construction Company
New boutique winery building for Valdemar Estates USA

Completed Scope

Installed Cement panel siding system per project specifications.

CTUIR Education Facility

Completed 2018
Mission, OR (Confederated Tribes of the Umatilla Indian Reservation)
GC: Chervenell Construction Company
Tribal education facility for the CTUIR (46411 Timíne Way)

Completed Scope

Installed exterior finish carpentry and siding system, TERO-compliant.

WGL Mattawa Seasonal Farmworker Housing

Completed 2017
Mattawa, WA
GC: Walker Construction, Inc.
Seasonal farmworker housing community on Pat-Chee Drive

Completed Scope

Completed exterior siding scope per estimates dated December 2016 and May 2017.

CBC Student Housing

Completed 2017
Pasco, WA
GC: Chervenell Construction Company
Columbia Basin College student housing at 20th and Argent

Completed Scope

Pre-primed cement panel and lap siding, 3/8" pressure-treated rain-screen battens at 16" o.c., bug screen, aluminum trim at cement panels, self-adhered membrane window tape.

Providence SJCC Renovation

Completed 2017
Spokane, WA
GC: Graham Construction & Management, Inc.
Providence St. Joseph's Care Center renovation (17 E. 8th Avenue) for Providence Health & Services — phased exterior work performed within an active care facility

Completed Scope

Installed Hardie Panel and Hardie Plank siding system install, including all fasteners, trim, J-channel and vertical trim, DuPont SAM at corners, and rainscreen system under siding. Project required DSNS background checks, TB testing, and integrated pull-planning coordination with the healthcare client.

I-5 Casino — Phase I

Completed 2017
Tacoma, WA (Puyallup Tribe of Indians)
GC: Swinerton Builders
Casino garage at 1620 E 29th Street and casino office at 1690 E 30th Street

Completed Scope

Completed fiber-cement siding scope, including all building wrap, opening wrap, horizontal backing strip, furring strips, cavity vent strips, sheet metal flashing and trim, and field testing for water-tight installation.

ADSG Office Building

Completed 2017
Richland, WA
GC: Siefken & Sons Construction, Inc.
ADSG, LLC new office building on Columbia Park Trail

Completed Scope

Installed Nichiha fiber-board siding system and pre-finished cedar soffit per project plans and specifications.

Snoqualmie C-Store Development

Completed 2017
Snoqualmie, WA (Snoqualmie Tribe)
GC: Swinerton Builders
Tribal convenience store development at 37500 SE Northbend Way

Completed Scope

Installed Hardie board siding with full sheet-metal flashing and trim, horizontal backing, building wrap (entire building including columns), furring strips, cavity vent strips, sealants, and field testing.

Sun Tower Apartment Rehabilitation

Completed 2016
Yakima, WA
GC: Dawson Construction, LLC
Sun Tower apartment building at 6 North 6th Street (Owner: Beacon Development Group)

Completed Scope

Completed vinyl-window installation package, including federal Davis-Bacon prevailing-wage compliance.

Yakima Valley 7

Completed 2015
Yakima, WA
GC: Walker Construction, Inc.
147 units across 7 separate locations

Completed Scope

Installed exterior siding and envelope work delivered concurrently across all seven sites — a coordinated, multi-site execution.

Granite Pointe II

Completed 2015
Spokane Valley, WA
GC: A & A Development Group, Inc.
Multi-building apartment complex

Completed Scope

Siding installation across multiple buildings on the Granite Pointe II site.

Jadwin Stevens Apartments

Completed 2015
Richland, WA
GC: Ramey Construction
Apartment community at 1851 Jadwin Avenue

Completed Scope

Completed exterior siding scope per project plans and specifications.

Yakama Master Plan — Legends Casino Expansion

Completed 2015
Toppenish, WA (Yakama Nation)
GC: Swinerton Builders
Casino expansion building under the Yakama Nation Master Plan

Completed Scope

Supplied and installed Hardi Board siding system per project specifications.

Yakima Housing Renovations (Yakima Family Housing)

Completed 2014
Yakima, WA
GC: Walker Construction, Inc.
13 separate housing authority properties

Completed Scope

Multi-Family Preservation siding and exterior envelope renovation across all 13 sites for the Yakima Housing Authority.

Ready to Bid Your Next Project?

Send our estimating team your plans, ITBs, and project specifications.

Get an Estimate