Project Portfolio
A proven track record of executing complex exterior envelopes for large-scale developments, prevailing wage public works, and tribal facilities across the Pacific Northwest.
The Bob Apartments
In ProgressCompleted Scope
Fiber cement, wood, and metal siding installation, complete with all related trim, sealants, and flashings to deliver a finished exterior envelope.
Nespelem Longhouse / Community Center
Completed 2026Completed Scope
Installed Phenolic wall panel installation with z-girts, rigid insulation, and flashing system (labor-only scope).
Southridge Apartments
Completed 2025Completed Scope
Turnkey siding and vertical envelope, including Hardie/cemplank lap, panel, and soffit; drainable weather barrier; vinyl window installation; Trex deck install with hidden fasteners; and full sheet-metal fabrication and flashings package.
Casa de la Mora Apartments
Completed 2025Completed Scope
Completed weather-barrier (DuPont Tyvek), vinyl window install, fiber-cement Hardie siding, pre-finished Taylor Metal 22-gauge steel siding, and full trim and flashing package — Davis-Bacon residential prevailing wage.
Buttercreek Apartments
Completed 2025Completed Scope
Completed Division 7 siding removal and installation with Division 8 vinyl window and sliding-glass-door installation per plans and specifications.
Mattawa Slope WGL Phase 3
Completed 2025Completed Scope
Installed Hardie siding, paneling, soffit, trim, WRB, window tape, seam tape, sealants, flex flashing, Brand X aluminum trim, and cedar accents.
Scattered Sites Phase 3
Completed 2025Completed Scope
Continuation of multi-site exterior renovation — siding, trim, and weather-barrier replacement.
Eastern Oregon University
Completed 2025Completed Scope
Demolition, complete siding, vinyl window installation, and finish carpentry under Oregon BOLI prevailing wage.
Plastic Surgery Northwest
Completed 2025Completed Scope
Installed Quick Panel fascia panels, weather barrier, and complete flashings package at all metal-cladding locations.
University Crossing
Completed 2024Completed Scope
Completed Division 7 exterior building envelope — cementitious siding system, weather barrier, sheet metal flashings, sealants, and trim work for the entire community.
Highland Village Phase 2
Completed 2024Completed Scope
Installed Cementitious siding system with R5 rigid insulation, vinyl window installation with flashing and sill pans, and full caulking package across all 7 buildings (Davis-Bacon residential prevailing wage; Section 3 and Evergreen Sustainable Development Standard).
WSU Vineyard Phase 2 Apartments
Completed 2024Completed Scope
Pre-primed cement panel siding, aluminum trim, Tyvek weather barrier, soffits at breezeways, under decks, and accent bands, plus Miratec trim and stairwell siding.
Rhine Village Apartments
Completed 2024Completed Scope
Completed lump-sum siding installation per project plans and specifications.
Sun Garden Apartments
Completed 2024Completed Scope
Removed of existing vinyl siding, soffit, and metal fascia; new fiber-cement siding with LP shake, LP trim, house wrap, caulking, flashings, and new metal fascia.
Wild Rose Apartments
Completed 2024Completed Scope
Completed lump-sum siding installation under Washington prevailing wage (Statement of Intent #1576444).
South Hill II Phase I
Completed 2024Completed Scope
Installed Cemplank fiber-cement siding with Hardie trim, commercial-grade Tyvek system, full caulking package, and 26-gauge aluminum gutters and downspouts.
Sycamore Glen at Quail Hollow
Completed 2024Completed Scope
Installed Hardie lap and board-and-batten siding with all corresponding trims, soffit, and fascia; complete WRB system. Includes vinyl-siding removal on existing building.
Sunnyside Manor II
Completed 2024Completed Scope
Fiber-cement siding, LP trim, Hardie soffit, commercial-grade Tyvek system, R-5 extruded polystyrene insulation, full caulking and flashing package, plus installation of supplied windows and doors.
Davis Apartments
Completed 2024Completed Scope
Installed Hardie 4" and 7" lap siding, Cemplank, Hardie board-and-batten siding, Hardie trim, GreenGuard Raindrop 3D drainage wrap, single-piece parapet caps, soffits at stair landings, breezeway lids, and under-deck areas, with full flashing and caulking package.
Pendleton Cottages 2475 & 2543 Siding Replacement
Completed 2024Completed Scope
Completed siding replacement at both cottages — direct State of Oregon public-improvement contract under BOLI Region 12 prevailing wage.
Yellowhawk Tribal Health Center
Completed 2024Completed Scope
Completed exterior cladding/siding scope under Davis-Bacon prevailing wage with certified payroll.
Fire Station 85
Completed 2024Completed Scope
Completed exterior siding and envelope per project specifications.
Boardman Regional Crisis Center
Completed 2024Completed Scope
Installed exterior siding and cladding system per project specifications, including specialty high-impact detailing on the residential side.
CTUIR Tamastslikt Museum Phase 2
Completed 2024Completed Scope
Demolished and replace existing siding and 26 windows. Includes window installation with exterior backer-rod and sealant, interior trim and furring, sill pans, flashing, and pre-construction coordination with window supplier for warranty compliance.
College Place Apartments
Completed 2023Completed Scope
Completed Division 7 exterior building envelope (excluding roofing) — siding, sheet metal wall caps, finish carpentry, trim, soffits, weather barrier, butyl flashings, and clubhouse mailroom finishes.
Fruitvale Housing
Completed 2023Completed Scope
Tyvek Drainage Wrap, vinyl windows, full Hardie pre-primed cement-fiber siding system with manufactured wood trim and complete flashing/sealant package.
CTUIR Timine North Multi-Family Housing
Completed 2023Completed Scope
Installed exterior siding and trim across all buildings — TERO-compliant project with certified payroll.
Moorehouse Apartments
Completed 2023Completed Scope
Completed lump-sum siding installation per project plans and specifications.
Mirabeau Apartments — Phase 1
Completed 2023Completed Scope
Installed Hardie Plank lap siding (cedar-mill 7" reveal), Hardie Panel at board-and-batten and channel sections, Hardie Soffit, full trim and aluminum extrusion details, and complete flashing package across all 4 buildings.
CV The Clark
Completed 2023Completed Scope
Completed exterior siding scope per project plans and specifications under Master Subcontract Agreement.
Scattered Sites Exterior Renovations
Completed 2023Completed Scope
Completed exterior renovation scope across multiple sites — siding, trim, and weather-barrier replacement.
Whitstran Elementary Additions & Modernization
Completed 2023Completed Scope
Installed Cement panel siding system installation per project specifications under prevailing wage with Intent/Affidavit/Certified-Payroll filings.
Sunnyside Housing Authority MFP
Completed 2022Completed Scope
Demolished of existing siding, trim, fascia, and soffit; new install of James Hardie Prevail lap siding, soffit, trim, weather barrier system, vinyl windows, and exterior doors across the entire portfolio.
The Park at Medical Lake
Completed 2022Completed Scope
Completed exterior siding installation per project plans and specifications.
Foothills Apartment Renovations
Completed 2022Completed Scope
Demolished of existing vinyl siding; install of new rigid insulation, fiber-cement siding, soffit and trim, weather barrier system, vinyl windows and doors, and full gutter and downspout package across all 5 buildings.
Meadowlark Senior
Completed 2022Completed Scope
Installed weather barrier with all tapes, flashings, fasteners and flex wraps; complete fiber-cement siding and trim system; vented and non-vented soffit; column and beam wraps; metal flashings and metal fascia wrap; full caulking package. Includes Alternate 2 (balconies).
Camp Umatilla Enlisted Barracks 1–4
Completed 2022Completed Scope
Installed exterior fiber-cement siding system with Rockwool/rigid thermal insulation, weather barrier, stainless-steel flashings, joint sealants, finish carpentry, and vinyl window installation across all four barracks.
Alder Terrace
Completed 2021Completed Scope
Re-cladding of the existing siding assembly with James Hardie Prevail panel-and-lap fiber-cement siding, ventilated soffit panel system, new insulation, and complete trim, flashing, weather-barrier, and sealant package.
Sunset Ridge
Completed 2021Completed Scope
Demolished and full re-clad with new Prevail siding, Homeguard weather-barrier system, Hardie trim and soffit, post-and-beam wraps, new metal fascia, and installation of 32 exterior doors and 164 vinyl windows.
Garten House Apartments
Completed 2021Completed Scope
Demolished of existing trim and shutters; install of rain screen, weather barrier, vinyl windows and sliders, full trim package (belly band, battens, corner trim), 1x4 tight-knot cedar accents, and rigid insulation throughout.
Mariposa Park Apartment Repairs & Rehabilitation
Completed 2021Completed Scope
Removed of existing metal siding and trim; new fiber-cement siding, trim, soffit, and fascia with weather-barrier system, AC unit reframing and insulation, and gable-extension framing across all buildings on Cherry Street.
Riverside Professional Center
Completed 2021Completed Scope
Completed vertical aluminum siding, horizontal steel siding (Tyvek underlayment), metal trims, aluminum dormer soffits, matching fascia, deck demo, deck-frame repairs, James Hardie deck face, and cable-rail handrail system.
Condon Grade School
Completed 2021Completed Scope
Completed exterior siding and finishes per project specifications and prevailing wage requirements.
Cle Elum Ambulance Garage
Completed 2021Completed Scope
Installed Greenguard Raindrop 3D weather barrier with all tapes, flashings, fasteners and flex wraps; complete fiber-cement siding and trim system; LP shake (in lieu of Hardie shake); vented and non-vented soffit; metal flashings.
Heatherstone Apartments Rehabilitation
Completed 2020Completed Scope
Completed full exterior re-cladding — demo of existing siding, soffit, and fascia, then complete reinstall with HardiePlank lap, fiber-cement panel, and Hardie Shake siding, board-and-batten accents, all trims, soffit, weather barrier, and new metal fascia.
Columbia Park Apartments
Completed 2020Completed Scope
Siding, vinyl windows, and rain gutters across all 32 buildings (Davis-Bacon prevailing wage).
Greenpointe Townhomes
Completed 2020Completed Scope
Completed lump-sum siding and weather-barrier system installation across the entire development.
Chuck Austin Place
Completed 2020Completed Scope
Weather-resistive barriers, flexible-membrane flashings, cementitious trim and soffits, sealants, and vinyl window installation across all five buildings (Davis-Bacon residential prevailing wage).
Arrow Point Community Association
Completed 2019Completed Scope
Installed Hardie Shake siding installation per James Hardie HS1067 best practices — preserving the 30-year product warranty — including the curved-reveal verandas requiring an approved first-article installed.
Cosecha Court II Phase 2
Completed 2019Completed Scope
Fiber-cement siding and soffit, fiber-cement window and door trim, metal outside and inside corners, flashing at soffit and concrete, deck board wraps, vinyl window installation, commercial-grade Tyvek WRB, and metal fascia at gables.
Ronald McDonald Madison Street House
Completed 2019Completed Scope
Installed weather barrier system (complete) plus fiber-cement panel system with all vertical and horizontal trims (Tamlyn or approved alternate), termination/transition trims, rain-screen furring strips, and Pella wood-clad window detailing.
Wilbur and Cook Affordable Housing Portfolio
Completed 2018Completed Scope
Tear-off of existing vinyl siding at garages; replacement of fascia with Hardie products; new siding install across all three sites with full flashings and trim package.
Sunset Americana Apartments
Completed 2018Completed Scope
Demolished of existing siding and lava rock; new house wrap; Hardie HZ5 5" and 8" reveal smooth siding, Hardie Panel for board-and-batten, vinyl windows and sliders, and soffit installation at all covered lids.
WSU Tri-Cities Student Housing
Completed 2018Completed Scope
Installed Cement panel siding system per project specifications.
Mattawa Slope WGL Phase II
Completed 2018Completed Scope
Completed exterior siding scope with full trim and weather-barrier package.
Cosecha Court II
Completed 2018Completed Scope
Completed exterior siding system including all trims, soffit, and fascia per project plans and specifications.
English Village & Coeur d'Alene Manor
Completed 2018Completed Scope
Completed exterior siding scope across both properties.
Scott Street Apartments
Completed 2018Completed Scope
Installed Hardie 7" cedar-milled lap siding (factory primed) at patios, sidewalls and breezeways; Hardie panel siding; Tyvek residential home wrap; window tape at heads and jambs; full vertical, horizontal, J, and corner trim package; tongue & groove soffit; mount blocks at lights.
Memory Care Addition — Riverview Retirement Community
Completed 2018Completed Scope
Completed fiber-cement (cement-board) siding scope — smooth fiber-cement materials with mock-up, courtyard fence siding, aluminum trim system, jamb and sill flashing, joint sealants, and dedicated pollution-insurance policy.
Valdemar Winery
Completed 2018Completed Scope
Installed Cement panel siding system per project specifications.
CTUIR Education Facility
Completed 2018Completed Scope
Installed exterior finish carpentry and siding system, TERO-compliant.
WGL Mattawa Seasonal Farmworker Housing
Completed 2017Completed Scope
Completed exterior siding scope per estimates dated December 2016 and May 2017.
CBC Student Housing
Completed 2017Completed Scope
Pre-primed cement panel and lap siding, 3/8" pressure-treated rain-screen battens at 16" o.c., bug screen, aluminum trim at cement panels, self-adhered membrane window tape.
Providence SJCC Renovation
Completed 2017Completed Scope
Installed Hardie Panel and Hardie Plank siding system install, including all fasteners, trim, J-channel and vertical trim, DuPont SAM at corners, and rainscreen system under siding. Project required DSNS background checks, TB testing, and integrated pull-planning coordination with the healthcare client.
I-5 Casino — Phase I
Completed 2017Completed Scope
Completed fiber-cement siding scope, including all building wrap, opening wrap, horizontal backing strip, furring strips, cavity vent strips, sheet metal flashing and trim, and field testing for water-tight installation.
ADSG Office Building
Completed 2017Completed Scope
Installed Nichiha fiber-board siding system and pre-finished cedar soffit per project plans and specifications.
Snoqualmie C-Store Development
Completed 2017Completed Scope
Installed Hardie board siding with full sheet-metal flashing and trim, horizontal backing, building wrap (entire building including columns), furring strips, cavity vent strips, sealants, and field testing.
Sun Tower Apartment Rehabilitation
Completed 2016Completed Scope
Completed vinyl-window installation package, including federal Davis-Bacon prevailing-wage compliance.
Yakima Valley 7
Completed 2015Completed Scope
Installed exterior siding and envelope work delivered concurrently across all seven sites — a coordinated, multi-site execution.
Granite Pointe II
Completed 2015Completed Scope
Siding installation across multiple buildings on the Granite Pointe II site.
Jadwin Stevens Apartments
Completed 2015Completed Scope
Completed exterior siding scope per project plans and specifications.
Yakama Master Plan — Legends Casino Expansion
Completed 2015Completed Scope
Supplied and installed Hardi Board siding system per project specifications.
Yakima Housing Renovations (Yakima Family Housing)
Completed 2014Completed Scope
Multi-Family Preservation siding and exterior envelope renovation across all 13 sites for the Yakima Housing Authority.
Ready to Bid Your Next Project?
Send our estimating team your plans, ITBs, and project specifications.
Get an Estimate